1.
Long, K. R. "Statistical methods of estimating mining costs." In SME Annual Meeting and Exhibit and CMA 113th National Western Mining Conference 2011, pp. 147-151. 2011.
2. Mohutsiwa, M. and Musingwini, C., "Parametric estimation of capital costs for establishing a coal mine: South africa case study",
Journal of the Southern African Institute of Mining and Metallurgy, Vol. 115, No. 8, (2015), 789-797.
3. Shafiee, S. and Topal, E., "New approach for estimating total mining costs in surface coal mines",
Mining Technology, Vol. 121, No. 3, (2013), 109-116.
4.
Rahmanpour, M., and M. Osanloo. "Resilient decision making in open pit short-term production planning in presence of geologicuncertainty." International Journal of Engineering, Transactions A: Basics 29, no. 7 (2016): 1022-1028.
5.
Nourali, Hamidreza, and Morteza Osanloo. "A regression-tree-based model for mining capital cost estimation." International Journal of Mining, Reclamation and Environment (2018): 1-13.
6. Nourali, Hamidreza, and Morteza Osanloo. "Mining capital cost estimation using Support Vector Regression (SVR)."
Resources Policy , (2018).
7. Camm, T.W., "The development of cost models using regression analysis", in SME Annual Meeting, Phoenix, Arizona. Vol., No. Issue, (1992 of Conference).
8.
Mular, A. L. "The Estimation of Preliminary Capital Costs. Mineral Processing Plant Design." New York, New York, USA: Society of Mining Engineers of the AIME Inc (1978).
9. O Hara, T.A., "A parametric cost estimation method for open pit mines",
H.L. Hartman ed., Society of mining engineers (SME), New York, 1980.
10. O’Hara, T.A., "Quick guides to the evaluation of ore-bodies,
Bulletin of Canadian Institute of Mining, Metallurgy, Vol. 73, (1980), 87-99.
11. Huang, X.X., Newnes, L.B. and Parry, G.C., "The adaptation of product cost estimation techniques to estimate the cost of service",
International Journal of Computer Integrated Manufacturing, Vol. 25, No. 4-5, (2012), 417-431.
12. Niazi, A., Dai, J.S., Balabani, S. and Seneviratne, L., "Product cost estimation: Technique classification and methodology review",
Journal of Manufacturing Science and Engineering, Vol. 128, No. 2, (2006), 563-575.
13. Smith, A.E. and Mason, A.K., "Cost estimation predictive modeling: Regression versus neural network",
The Engineering Economist, Vol. 42, No. 2, (1996), 137-161.
14. Daud, B.H., "A model for preliminary evaluation of underground coal mines, computer methods for the 80’s in the mineral industry, mine development and valuation",
(Book) SME, Chapter 3, Section 3, (1979).
15. Petrick, A. and Dewey, R., Micro computer cost models for mining and milling, in Mineral resource management by personal computer. 1987.
16. Prasad, L., "Mineral processing plant design and cost estimation",
Processors Division of Canadian Institute of Mining, Metallurgy and Petroleum, Montreal, Vol., No., (1969).
17. Redpath, J.S.,
Estimation of preproduction and operating costs of small underground deposits, M.O.S.A. Services, Editor. 1986: Canada.252.
18. Stebbins, S.A.,
Cost estimation handbook for small placer mines. 1987, US Bureau of Mines Information Circular 9170.
19. Sayadi, A.R., Khalesi, M.R. and Khoshfarman Borji, M., "A parametric cost model for mineral grinding mills",
Minerals Engineering, Vol. 55, No., (2014), 96-102.
20. Arfania, S., Sayadi, A.R. and Khalesi, M.R., "Cost modelling for flotation machines",
Journal of the Southern African Institute of Mining and Metallurgy, Vol. 117, No. 1, (2017), 89-96.
21. Oraee, B., Lashgari, A. and Sayadi, A.R., "Estimation of capital and operating costs of backhoe loader", in Society of mininm engineers (SME), Denver, Canada. Vol., No. Issue, (2011, of Conference).
22. Sayadi, A.R., Lashgari, A., Fouladgar, M.M. and Skibniewski, M.J., "Estimating capital and operational costs of backhoe shovels",
Journal of Civil Engineering and Management, Vol. 18, No. 3, (2012), 378-385.
23. Bertisen, J. and Davis, G.A., "Bias and error in mine project capital cost estimation",
The Engineering Economist, Vol. 53, No. 2, (2008), 118-139.
24. Pohl, G. and Mihaljek, D., "Project evaluation and uncertainty in practice: A statistical analysis of rate-of return divergences of 1,015 world bank projects",
World Bank Economic Review, Vol. 6, No. 2, (2002), 235-277.
25. Noakes, M. and Lanz, T., "Cost estimation handbook for the australian mining industry, Australasian Institute of Mining and Metallurgy, Vol. 20, (1993), 412-4120.
26. Wellmer, F.W., Dalheimer, M. and Wagner, M., "Economic evaluations in exploration, Springer, (2008), 35- 40.
27. Adalier, O., Uğur, A., Korukoğlu, S. and Ertaş, K., "A new regression based software cost estimation model using power values", in International Conference on Intelligent Data Engineering and Automated Learning, Springer. (2007), 326-334.
28. Bontempi, G. and Kruijtzer, W.J.S.C., "The use of intelligent data analysis techniques for system-level design: A software estimation example", Vol. 8, No. 7, (2004), 477-490.
29. Duckworth, D. and John, P.S.,
Copper mine project profiles - 2016 edition. 2016, CRU: London, United Kingdom.220.