1. Kim, C., Djamaludin, I. and Murthy, D., "Warranty and discrete preventive maintenance", Reliability Engineering & System Safety, Vol. 84, No. 3, (2004), 301-309.
2. Desai, P.S. and Padmanabhan, P., "Durable good, extended warranty and channel coordination", Review of Marketing Science, Vol. 2, No. 1, (2004).
3. Khiabani, V. and Rangan, A., "Extended warranty policies with varying objectives", International Journal of Industrial and Systems Engineering, Vol. 10, No. 4, (2012), 430-450.
4. Gallego, G., Wang, R., Ward, J., Hu, M. and Beltran, J.L., "Flexible‐duration extended warranties with dynamic reliability learning", Production and Operations Management, Vol. 23, No. 4, (2014), 645-659.
5. Huang, Y.-S., Huang, C.-D. and Ho, J.-W., "A customized two-dimensional extended warranty with preventive maintenance", European Journal of Operational Research, Vol. 257, No. 3, (2017), 971-978.
6. Wang, J., Zhou, Z. and Peng, H., "Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance", Reliability Engineering & System Safety, Vol. 162, (2017), 14-27.
7. Jiang, B. and Zhang, X., "How does a retailer's service plan affect a manufacturer's warranty?", Management Science, Vol. 57, No. 4, (2011), 727-740.
8. Heese, H.S., "Retail strategies for extended warranty sales and impact on manufacturer base warranties", Decision Sciences, Vol. 43, No. 2, (2012), 341-367.
9. Esmaeili, M., Gamchi, N.S. and Asgharizadeh, E., "Three-level warranty service contract among manufacturer, agent and customer: A game-theoretical approach", European Journal of Operational Research, Vol. 239, No. 1, (2014), 177-186.
10. Yeh, W.-C. and Hsieh, T.-J., "Solving reliability redundancy allocation problems using an artificial bee colony algorithm", Computers & Operations Research, Vol. 38, No. 11, (2011), 1465-1473.
11. Tong, P., Liu, Z., Men, F. and Cao, L., "Designing and pricing of two-dimensional extended warranty contracts based on usage rate", International Journal of Production Research, Vol. 52, No. 21, (2014), 6362-6380.
12. Darghouth, M., Ait-kadi, D. and Chelbi, A., "Joint optimization of design, warranty and price for products sold with maintenance service contracts", Reliability Engineering & System Safety, Vol. 165, (2017), 197-208.
13. Mokhtari, H., Noroozi, A. and MOLLA, A.Z.S., "A reliability based modelling and optimization of an integrated production and preventive maintenance activities in flowshop scheduling problem", International Journal of Engineering, Vol 28, No. 12, (2015), 1774-1781.
14. Mishra, A. and Jain, M., "Maintainability policy for deteriorating system with inspection and common cause failure", Int J Eng Trans C Basics, Vol. 26, No. 6, (2013), 371-380.
15. Soltani, R., Tofigh, A. and Sadjadi, S., "Redundancy allocation combined with supplier selection for design of series-parallel systems", International Journal of Engineering-Transactions B: Applications, Vol. 28, No. 5, (2014), 730-737.
16. Shang, L., Si, S. and Cai, Z., "Optimal maintenance–replacement policy of products with competing failures after expiry of the warranty", Computers & Industrial Engineering, Vol. 98, No., (2016), 68-77.
17. Ashayeri, J., Ma, N. and Sotirov, R., "The redesign of a warranty distribution network with recovery processes", Transportation Research Part E: Logistics and Transportation Review, Vol. 77, No., (2015), 184-197.
18. Derringer, G. and Suich, R., "Simultaneous optimization of several response variables", Journal of Quality Technology, Vol. 12, No. 4, (1980), 214-219.
19. Pasandideh, S.H.R., Niaki, S.T.A. and Asadi, K., "Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: Nsga-ii and nrga", Information Sciences, Vol. 292, (2015), 57-74.
20. Glover, F., "Heuristics for integer programming using surrogate constraints", Decision Sciences, Vol. 8, No. 1, (1977), 156-166.
21. Talbi, E.-G., "Metaheuristics: From design to implementation, John Wiley & Sons, Vol. 74, (2009).