The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach

Authors

Department of Industrial Engineering, Faculty of Engineering, Yazd University, Yazd, Iran

Abstract

Abstract: In recent decades, high profits of extended warranty have caused that third-party firms consider it as a lucrative after-sales service. However, customers division in terms of risk aversion and effect of offering extended warranty on manufacturers’ basic warranty should be investigated through adjusting such services. Since risk-averse customers welcome extended warranty, while the customers without taking on risk may remain at the level of basic warranty. In this paper, a multi-objective integer nonlinear programming model is presented for integrating the supply chain of after-sales services. In the suggested model, firstly strategies used by the manufacturers in the basic warranty period and the third party’s policy during the extended warranty period, including the development of a new imperfect maintenance approach, are regulated. Then, the effects of these strategies on the desirability of customers with different levels of risk-taking are analyzed. To optimize the model, the scatter search based approach was introduced for extracting set of non-dominated solutions. The results indicated that increasing level of customers’ risk-taking convinces manufacturers to diminish the basic warranty period and the third party can apply less costly preventive maintenance. Key Words: Warranty, Extended warranty, After-sales services, Customers’ risk-taking, Pareto-set solutions, Multi-objective scatter search

Keywords


1.     Kim, C., Djamaludin, I. and Murthy, D., "Warranty and discrete preventive maintenance", Reliability Engineering & System Safety,  Vol. 84, No. 3, (2004), 301-309.
2.     Desai, P.S. and Padmanabhan, P., "Durable good, extended warranty and channel coordination", Review of Marketing Science,  Vol. 2, No. 1, (2004).
3.     Khiabani, V. and Rangan, A., "Extended warranty policies with varying objectives", International Journal of Industrial and Systems Engineering,  Vol. 10, No. 4, (2012), 430-450.
4.     Gallego, G., Wang, R., Ward, J., Hu, M. and Beltran, J.L., "Flexible‐duration extended warranties with dynamic reliability learning", Production and Operations Management,  Vol. 23, No. 4, (2014), 645-659.
5.     Huang, Y.-S., Huang, C.-D. and Ho, J.-W., "A customized two-dimensional extended warranty with preventive maintenance", European Journal of Operational Research,  Vol. 257, No. 3, (2017), 971-978.
6.     Wang, J., Zhou, Z. and Peng, H., "Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance", Reliability Engineering & System Safety,  Vol. 162, (2017), 14-27.
7.     Jiang, B. and Zhang, X., "How does a retailer's service plan affect a manufacturer's warranty?", Management Science,  Vol. 57, No. 4, (2011), 727-740.
8.     Heese, H.S., "Retail strategies for extended warranty sales and impact on manufacturer base warranties", Decision Sciences,  Vol. 43, No. 2, (2012), 341-367.
9.     Esmaeili, M., Gamchi, N.S. and Asgharizadeh, E., "Three-level warranty service contract among manufacturer, agent and customer: A game-theoretical approach", European Journal of Operational Research,  Vol. 239, No. 1, (2014), 177-186.
10.   Yeh, W.-C. and Hsieh, T.-J., "Solving reliability redundancy allocation problems using an artificial bee colony algorithm", Computers & Operations Research,  Vol. 38, No. 11, (2011), 1465-1473.
11.   Tong, P., Liu, Z., Men, F. and Cao, L., "Designing and pricing of two-dimensional extended warranty contracts based on usage rate", International Journal of Production Research,  Vol. 52, No. 21, (2014), 6362-6380.
12.   Darghouth, M., Ait-kadi, D. and Chelbi, A., "Joint optimization of design, warranty and price for products sold with maintenance service contracts", Reliability Engineering & System Safety,  Vol. 165, (2017), 197-208.
13.   Mokhtari, H., Noroozi, A. and MOLLA, A.Z.S., "A reliability based modelling and optimization of an integrated production and preventive maintenance activities in flowshop scheduling problem",  International Journal of Engineering, Vol 28, No. 12, (2015), 1774-1781.
14.   Mishra, A. and Jain, M., "Maintainability policy for deteriorating system with inspection and common cause failure", Int J Eng Trans C Basics,  Vol. 26, No. 6, (2013), 371-380.
15.   Soltani, R., Tofigh, A. and Sadjadi, S., "Redundancy allocation combined with supplier selection for design of series-parallel systems", International Journal of Engineering-Transactions B: Applications,  Vol. 28, No. 5, (2014), 730-737.
16.   Shang, L., Si, S. and Cai, Z., "Optimal maintenance–replacement policy of products with competing failures after expiry of the warranty", Computers & Industrial Engineering,  Vol. 98, No., (2016), 68-77.
17.   Ashayeri, J., Ma, N. and Sotirov, R., "The redesign of a warranty distribution network with recovery processes", Transportation Research Part E: Logistics and Transportation Review,  Vol. 77, No., (2015), 184-197.
18.   Derringer, G. and Suich, R., "Simultaneous optimization of several response variables", Journal of Quality Technology,  Vol. 12, No. 4, (1980), 214-219.
19.   Pasandideh, S.H.R., Niaki, S.T.A. and Asadi, K., "Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: Nsga-ii and nrga", Information Sciences,  Vol. 292, (2015), 57-74.
20.   Glover, F., "Heuristics for integer programming using surrogate constraints", Decision Sciences,  Vol. 8, No. 1, (1977), 156-166.
21.   Talbi, E.-G., "Metaheuristics: From design to implementation, John Wiley & Sons,  Vol. 74,  (2009).